2019年7月10日星期三

The Russian customer participated in the XLA loading-The first day

In the morning of June 20, 2019, in Xinglu Air Separation’s workshop, the loading staff worked together to lift the close loop cooling tower lower case body and load the car. Under the professional guidance of director of our company and the cooperation of the on-site staff, the car was loaded successfully! At the same time, a Russian engineer and forwarder are on site to conduct loading inspection and take photos.
Air separation
The picture shows ladder platform loading
Air separation plant Manufacturer
As can be seen in the picture, the water cooling tower was lifted by the crane, moved slowly and placed carefully.
liquid oxygen plant
XLA has more than 30 years of design and manufacturing experience, and the workshop packaging director has also worked at XLA for more than 20 years. According to his rich loading experience and professional guidance. XLA can ensure that the equipment is in the best condition from production to transportation, from the factory to the customer’s project installation site.
Please refer to the water cooling tower loading truck video for details.


(source:https://www.airseparation-plant.cn/the-russian-customer-participated-in-the-xla-loading-the-first-day/)

没有评论:

发表评论