Operating of the whole
air separation plant consists of following two steps:
- Trial run of single componentunit:
That means the test, adjust and purge of each component before
comprehensive trial run of the whole plant. This is some kind of
inspection to the installation, to make sure that each single component
is correctly installed and all the components are correctly connected.
- Startup and normal running of the whole plant.
Air separation plant suppliers
To ensure the safety of the whole plant, as well as the continuous
running performance with reliable and high quality, all
relative operators shall know well each of the components unit, as well
as their instructions, major technical parameters, operating patterns
and operating procedures, major operating data and their correlation,
the reason of common failure and its solution. Under the condition
that the purity of product is guaranteed, increase the product output as
much as possible to lower the power consumption and investment cost.